Advanced Search
TANG Yan. Difficulty Analysis and Countermeasure of Greening Construction of Large-Scale Parks in Demolition Site of Suburbs with Plain River Network[J]. Journal of Technology, 2020, 20(3): 276-280,289. DOI: 10.3969/j.issn.2096-3424.2020.03.013
Citation: TANG Yan. Difficulty Analysis and Countermeasure of Greening Construction of Large-Scale Parks in Demolition Site of Suburbs with Plain River Network[J]. Journal of Technology, 2020, 20(3): 276-280,289. DOI: 10.3969/j.issn.2096-3424.2020.03.013

Difficulty Analysis and Countermeasure of Greening Construction of Large-Scale Parks in Demolition Site of Suburbs with Plain River Network

  • Shanghai is located in the impacting plain of the Yangtze River Delta, which is a typical plain river network area. And the construction of large-scale parks and green space was concentrated on the demolition sites of suburbs with plain river network, which also brings special difficulties to the greening construction. Taking the first phase of Maqiao Forest Sports Park in Minhang District as an example, this paper focuses on the analysis of the difficulties faced by the greening construction of large-scale parks in suburbs, and puts forward the engineering construction technology aiming at the site difficulties, counter-season construction and large-scale seedling transplantation, so as to provide reference for the construction of parks with same type in Shanghai.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    摩臣5娱乐专业提供🧾:摩臣5娱乐🚼、摩臣5摩臣5平台等服务,提供最新官网平台、地址、注册、登陆、登录、入口、全站、网站、网页、网址、娱乐、手机版、app、下载、欧洲杯、欧冠、nba、世界杯、英超等,界面美观优质完美,安全稳定,服务一流🧏🏻‍♀️♠︎,摩臣5娱乐欢迎您。 摩臣5娱乐官網xml地圖